google.com, pub-6546753431946252, DIRECT, f08c47fec0942fa0
top of page
Writer's pictureRS STORE ENTERPRISE

LI6800 LiCOR Photosynthesis Machine Warmup, Redo Test, Chemical Columns, C02 Cartridge Installation





KURSUS UNTUK RAKYAT : COURSES FOR PEOPLE


O2 max is not ok, can ignore it because using 3rd party CO2 cartridge

Before taking measurements with the LI-6800 photosynthesis system, a warm-up is crucial for optimal performance. This involves running a series of automated tests that assess the functionality of key components like sensors, gas analyzers, and the environmental control system. The warm-up process ensures accurate readings by stabilizing the instrument's internal environment and checking for potential errors, ultimately increasing the reliability of the photosynthesis data collected.


Timestamp:

00:00 Warm-up test screen

00:13 CO2 test Not OK - Forgot to change for a new CO2 Cartridge

00:24 Warm up screen will tell warnings and failures during the tests, then suggest what should be done for the failed ones

00:35 Four chemical columns at the back of the machine console

00:40 CO2 mixer, Drierite (desiccant), Stuttgarter Masse (Ceramic Humidifier) and Soda lime (CO2 scrubber)

00:58 Change new 8gm CO2 Cartridge correctly

02:00 Redo warm-up test only for CO2 Limits and Match

02:55 Can use 3rd party CO2 cartridge food grade with

04:15 Result of warm-up if C


Attribution 4.0 International — CC BY 4.0 - Creative Commons

0 views0 comments

Comments


bottom of page